Building Permits

What is a development permit and do I need one?

A Development Permit is required PRIOR to any development. It ensures that the development conforms with the Town’s zoning bylaw. 

When is a building permit required?

A Building Permit is required for: new building construction, garages/carports, decks (not built on grade), mobile homes, basement development in a dwelling, renovation, alteration or addition to an existing building, fireplaces, wood stoves, and heaters, change of use or occupancy of a building.  Please be advised that the replacing of a deck does require a building permit.

Permits are NOT required for: fences, driveways and parking lots, sidewalks, painting, decorating, laying carpet and general maintenance, replacement using the same materials (ie: replacing deck boards) and not affecting structural, electrical, or mechanical systems.

Does the Town of Davidson have a qualified building inspector(s)?

The Town of Davidson has contracted the services of Professional Building Inspections, Inc. They are based out of Emerald Park and their contact number is 1-306-536-1799.

What is the cost of a building permit?

The cost of a building permit is contingent upon what it is you are building. Please inquire at the Town Office for the cost.

What if I’m moving in a building, do I still require a permit?

Yes, a permit is still required. A pre-move inspection is required to determine the structural integrity of the building. You would contact the Town’s building inspector directly to request this. It is recommended that this inspection be done PRIOR to the purchasing of the building to ensure that you are purchasing a structurally sound building (buyer beware…).

What is entailed in the Permit Approval Process?

  1. Apply for a development permit.
  2. After the development permit is approved, a building permit application is then taken out. Complete the Plan Review Checklist , which needs to be attached to your application, to ensure that any required documentation is included with your permit application when you submit it.
  3. Once submitted to the Town Office, administration then forwards it to the building inspectors for plan review.
  4. Once the information and plans have been reviewed by the building inspector, the inspector will return a copy of the reviewed plans to the Town administration, who then reviews the documents and then notifies the applicant that the permit is formally approved, pending payment of the permit fee.

What happens if I don't apply for a permit?

Having to take out a building permit reflects an organized, forward thinking community.  Also, the concept of building permits separates the fly by night contractors from the legitamite ones.  We are not going to patrol the community looking for building activity where no permit has been taking out.  However, if it comes to light that something was built without a permit, then  the appropriate measures to ensure the proper permit(s) are taken out and enforced.

How do I know what supporting information the building inspector will need to approve my permit application?

Aside from referring to and completing the Plan Review Checklist, the supporting information that will be required will depend on the type of construction you are doing. Specific design information sheets that are available at the Town Office.

So when I submit my application for a permit, what needs to be included?

When submitting your application for a building permit, you will also need to include the following:

  1. A completed Building Permit application
  2. A completed Plan Review Checklist along with the supporting information as outlined on the checklist. Failure to submit the required information will delay the issuance of your building permit.

If I am demolishing a building, is a permit required for that?

Yes, a Permit to Demolish a Building is required. The fee for a demolition permit is $25.00.

What's the big deal if I've taken out the required permits, built the structure, but there are a few outstanding issues?  Do I have to finish those or how long do I have to correct the inefficiencies that the inspector has made note of on my inspection report?

When you are billed for your building permit, included is the required amount of inspections.  However, if the inspector has noted any deficiencies that are required to be rectified, each extra time he stops to do an inspection to make sure the rectifications were completed there  is a $ 160 inspection charge, plus mileage as it is an extra inspection.  So, it's in your best interest to complete any deficiencies as soon as possible.  Also, if the span of time for completion becomes excessive, then you may be charged for a second building permit.

What is involved with commercial building?

First, a development permit is applied for. Upon approval of the development permit, you will need to contact the commercial building inspector at Professional Building Inspections, Inc. (1-855-487-1799) directly for a commercial building permit application.

Who do I contact should I require any additional information or if I have any questions?

Should you have any questions, please do not hesitate to contact Davidson Town Administration at 306-567-2040 or email us at townofdavidson@sasktel.net.  If we are unable to answer your questions, we will refer you to the Building Inspectors.